Skip to content
MeridianCogent

The execution layer for separations and integrations

MeridianCogent models how a carve-out actually works — what a business depends on, what has to be untangled, in what order, and what it costs when that slips.

Walkthrough

The platform in ninety seconds

What it covers

Everything a separation actually runs on

A carve-out is not one problem. It is scope, obligations, contracts, costs, systems, people and dates, all moving at once and all depending on each other. MeridianCogent holds them in one place.

Scope and obligations

5 items
  • The perimeter register

    what transfers, what is retained, what remains disputed

  • Obligations and conditions precedent

    what must be done, and what gates closing

  • The consent register

    change-of-control consents and where they stand

  • Contract novation and assignment

    the full population to be re-papered

  • Attestations

    who confirmed what, and when

Cost and risk

7 items
  • TSA catalogue and exposure

    services, multi-currency, overrun and step-up pricing

  • Integration budget and cost-to-complete

    what the capture is costing

  • Stranded costs

    the overhead that does not leave when the business does

  • Advisory and transaction fees

    what the advisers on the deal are costing

  • Risk register

    assessed on two dimensions, never reduced to a score

  • The synergy ledger

    with every amount stating what it represents

  • Delay scenarios

    what a slipped date does to exit timing and cost

Execution

9 items
  • Program structure

    tasks, workstreams, typed dependencies and a real critical path

  • Guided program setup

    a new program shows what still needs to be configured rather than turning missing information into a zero

  • Gates that block rather than annotate

  • Systems register and decommission sequencing

    what the business runs on, and the order it comes apart in

  • Day 1 readiness

    derived from the chain, not typed into a status field

  • Cutover runbook and hypercare

    for the weekend itself, and the weeks immediately after

  • The communications plan

    who hears what, and when

  • Escalations with a clock

  • Reusable playbooks

    platform and organisation-owned playbooks instantiate tasks, dependencies, role mappings and country-specific work against program milestones, then can be adapted and saved back as reusable operating standards

Getting data in and out

5 items
  • Bulk import

    because a real carve-out arrives as a spreadsheet

  • Email-in

    for the people who will never log in

  • Exports, watermarked to whoever generated them

  • Full program export

    registers, decisions and the audit history remain readable outside the platform, not trapped inside the application

  • Public tools

    the TSA Exit Cost Calculator and the Day 1 Readiness Check, free to use without signing in

Visibility

7 items
  • Control tower, exceptions first

    six-week trajectories for Day 1 readiness, TSA monthly exposure and open blockers, each showing the coverage behind the number rather than a bare figure

  • Timeline rail

    the program sequence from signing through Day 1, TSA exit and integration completion, with country-specific lanes showing where jurisdictions diverge or block

  • Waiting on me

    one view of everything currently requiring action from you, matched across every register by identity rather than by name

  • Executive review

    the same governed numbers as the control tower, reweighted for steering committees, with a factual view of what changed since the last review point: gates cleared or reopened, dates moved, risks escalated, grouped by workstream

  • Portfolio view across several programs

    where an organisation is running more than one separation at a time

  • Coverage stays visible

    incomplete modelling, stale assumptions and unavailable inputs remain beside the figures they qualify, rather than disappearing behind a dashboard total

  • Dedicated external workspace

    advisors, counsel and other guests see the records and actions shared with them for their engagement, not a reduced copy of the full program control tower

Governance and audit

5 items
  • The decision record

    append-only, corrections supersede

  • Board pack export

    for the meeting that happens outside the platform

  • Activity centre and command palette

    what changed recently, and a way to reach any record without hunting for it

  • Culture and sentiment trend

    an imported trend line from whatever pulse-survey tool an organisation already runs, shown alongside the operational timeline: anonymous by default, suppressed below a minimum group size, and read as a direction of travel rather than a single score

  • Post-close retention

    customer-entered revenue retention and churn figures, held to the same basis-and-source discipline as every other governed number: who entered it, what it is based on, when it was last confirmed

The chain

Most tools track tasks. This one tracks consequence.

A separation is a chain, not a list: a shared system has to be untangled before a transitional service can end. MeridianCogent models that chain, and nothing in it is a status someone updates by hand.

Five stages, each depending on the one before: Systems register, Decommission sequencing, TSA exit dependencies, Exit risk, .

Systems register

What the business runs on, and what it shares with the parent.

Decommission sequencing

What has to be separated, untangled or stood up, and in what order.

TSA exit dependencies

Which transitional services cannot end until that work completes.

Exit risk

Where the modelled completion date falls after the contractual exit date.

Day 1 readiness

What is actually blocking Day 1, derived from the chain rather than typed into a status field.

The full case for this is in The Dependency Problem.

Preparing for Day 1 now? The Day 1 Readiness Check takes your own answers about the Day 1 preparations you have chosen to make and organises them into counts by area.

Control tower

Exceptions first, and never a bare figure

The control tower opens on what is moving against you, not on a wall of everything at once. Day 1 readiness, TSA monthly exposure and open blockers each carry a six-week trajectory, so the question is not only where a number stands but which way it has been going.

Each figure is reported with the coverage behind it — how much of the underlying population it actually reflects. A number drawn from a third of the register is not the same number as one drawn from all of it, and the difference stays visible rather than disappearing into a total.

Illustrative shape only — not data from a program. Each of these carries the coverage behind it: how much of the underlying population the figure actually reflects. A trajectory with thin coverage is reported as thin rather than smoothed into a clean line.

A schematic of three control-tower trajectories across a six-week window: Day 1 readiness, TSA monthly exposure and open blockers. Each is shown as a separate panel with its own line, because the three are measured in different units and do not share a scale. No values are given: the panels show the shape of a trajectory and the slot in which its coverage appears, not figures from any program. Illustrative shape only — not data from a program. Each of these carries the coverage behind it: how much of the underlying population the figure actually reflects. A trajectory with thin coverage is reported as thin rather than smoothed into a clean line.

Timeline

Jurisdictions run on their own clocks

A separation does not happen in one place. The program has a sequence — signing, Day 1, TSA exit, integration completion — and every jurisdiction inside it runs that sequence on its own calendar, against its own filings, consents and consultation periods.

The timeline rail holds both. Country lanes show where a jurisdiction has diverged from the program date or blocked outright, and what that does to the milestones downstream of it.

Illustrative. Germany is blocked at TSA exit while the US lane exits on schedule — the block does not stop the other lanes, but the consolidated integration date sits downstream of it and cannot be treated as reached.
Illustrative. Germany is blocked at TSA exit while the US lane exits on schedule — the block does not stop the other lanes, but the consolidated integration date sits downstream of it and cannot be treated as reached.
LaneSigningDay 1TSA exitIntegration complete
Program (the consolidated date)reachedreachedreachednot reached
Germany (consultation not closed)reachedreachedblockednot reached
US (exited on schedule)reachedreachedreachedreached

A program date is only as good as its latest lane. Showing the lanes separately is what makes that visible before the date arrives rather than after it.

Gates

Gates that actually block

Most platforms have gates that record disapproval. A gate is marked red, and the work continues anyway, because nothing in the system can stop it.

Here, a gate is a real constraint on the schedule. Work downstream of an unsatisfied gate cannot be scheduled as though the gate will clear. Conditions precedent block closing rather than annotating it. The critical path reflects what is genuinely possible, not what the plan assumed in January.

This is the difference between a system that reports on a program and a system that governs one.

The record

Every number has a named human behind it

The platform does not source legal requirements, costs, valuations or jurisdictional rules. Every material figure is entered by a customer or their advisor, and formally adopted by a named person before it can affect a plan.

When it is adopted, the platform takes a snapshot of exactly what was adopted and when. If the underlying figure later changes, the adoption is marked stale rather than silently updating — the original decision remains visible, along with who made it and on what basis.

Corrections are made by superseding a record, never by overwriting one. The history of what was believed, and when, survives intact.

This constraint is deliberate and it is not negotiable. A platform that asserts what a jurisdiction requires has taken on a liability it cannot discharge and a claim it cannot stand behind.

Access is scoped to the program rather than the organisation. Security and confidentiality covers how.

TSA exposure

Transitional services, modelled as exposure

A TSA is a live cost with an end date that may not hold. The platform ties each service to the work blocking its exit, so you know in March that the September exit will not happen.

For a first figure on a single agreement, the TSA Exit Cost Calculator works out what a TSA costs to its planned exit, and what an overrun adds.

The cost mechanics are in The Real Cost of a Late TSA Exit, and the published figures in the TSA Benchmarks Reference.

Modelled

Service catalogue
Multi-currency
Exposure
With step-up
Exit risk
Months ahead

Scenarios

What happens if this slips?

It is one thing to know a transitional service exits in September. It is another to know what a two-week delay on a single cutover does to that date — and to the invoice that follows it.

MeridianCogent is being built to answer that directly: take the current schedule, move one date, and see which transitional services can no longer end when they were meant to, and what that costs.

The question a CFO actually asks is not what the plan says. It is what the plan costs when it does not hold.